Safe cable routing, even over long travelling distances - in strong winds, sometimes heavy rain and corrosive sea air. With this challenge in mind, the two travelling trolleys were to be supplied safely with power and data for this shipyard crane, which is strikingly red to match the shipyard operator's logo.
The 122 m travel of the crane trolleys had to be taken into account when designing the cable routing, as did the impressive 18 kg weight per metre caused by the heavy cables. Due to the high frictional forces at this weight, a sliding energy chain was out of the question. In addition, with a cable routing of these dimensions, special care had to be taken to avoid a possible chain ascent, so that the e-chain® could not be reared up by the thrust "" .