To ensure that rockets can be assembled protected from external influences, large assembly halls are used that are located with the rocket directly on the rocket launch site. This means that the assembled rocket no longer needs to be transported afterwards. To release the rocket launch, these huge halls can be moved away from the launch pad in a linear fashion. The problem: all kinds of cables for the entire power supply of the peripheral devices (electrical, pneumatic and instrumental) lead into the hall from the launch tower. These have to be moved safely along a long route when the hall moves. The plant manufacturer Jaraguá Equipamentos was therefore looking for a cable routing system that would guide all the cables safely and reliably on the long journey.