Jack-up rigs are used as modular drilling rigs (MDR) to transport additional drilling equipment to fixed drilling platforms. Once at the drilling site, the legs of the drillship extend to the seabed and provide a secure foothold to lift the drilling floor to the level of the drilling platform. A cantilever is positioned above the drilling site and the drilling can begin.
For this jack-up rig, a suitable cable routing to the cantilever and the drilling floor was sought during the planning phase, which would be able to bear the high additional loads of the cable permanently and without failure. Another prerequisite for the installation was a space-saving system. The tight installation space required a compact but safe bundling of all cables.